Ctrlapptech
6:00 PMFactory shift change

Shift change, without the queue

Contract workers, vendors and trucks pass through one gate with the right checks. Passes are tied to the contractor, shift, safety induction and work permit, and every kilogram of material in or out has a gate pass.

Contractor Gate · Plant 2, Gate 3
Shift B · 6:00 PM

412

Workers in

37

Vendors on site

3

Passes expired

Contract labour

Sri Sai Contractors86 of 90 in · safety induction doneValid
Ganesh Electricals12 in · work permit WP-118Valid
Ravi FabricationPass expired yesterdayBlocked

Material in-out

Inward · Steel coils 6 tPO 4500231 · Truck TS 08 UB 2210Matched
Outward · Scrap 1.2 tGate pass GP-0907 · Returnable: NoWeigh check
Returnable · Welding setDue back 15 NovTracked
12 min
For 400 workers through 2 turnstile lanes
Live
Contractor-wise headcount
3 types
Inward, outward, returnable passes
0
Expired passes let through

Capabilities

Built for plants, warehouses and construction sites

Factory gates carry people and material at the same time. Ctrlapptech keeps both on record and stops what should not go through.

Contract labour passes

Workers are enrolled by the contractor with ID and photo, and get a card or QR pass valid for their shift.

Induction and permits

Entry is blocked until safety induction is complete. Hot work, height work and confined space permits are checked at the gate.

Live headcount

See who is inside by contractor, department and area, useful for muster during an emergency.

Vehicle and driver entry

Trucks are matched to purchase orders or delivery notes. Drivers get a pass and a waiting bay.

Material gate passes

Inward, outward and scrap passes with weight, quantity and approver, checked by the guard at the gate.

Returnable material

Tools and equipment sent out for repair are tracked until they return, with reminders when they are overdue.

At the gate

A contract worker's first day

  1. 01

    Contractor enrols the worker

    Name, photo, ID and skill from the contractor portal. HR or safety approves.

  2. 02

    Induction is recorded

    The safety team marks induction complete. Until then the pass cannot open the turnstile.

  3. 03

    Pass is issued

    A card or QR pass valid for the worker's shift, gate and areas.

  4. 04

    Gate checks every day

    Turnstile or guard checks the pass, shift and permit. Headcount updates live.

Details

What is included

Contractor management

  • Contractor portal for enrolment
  • Pass validity by contract dates
  • Worker attendance by contractor
  • Blocklist across sites

Material control

  • Inward against PO or delivery note
  • Outward with approver and weight
  • Returnable items with due dates
  • Scrap and waste dispatch records

Safety

  • Induction before first entry
  • Work permit checks at the gate
  • Emergency muster list
  • PPE reminder on entry screen

Questions

Asked at the gatehouse

Can contractors enrol their own workers?

Yes. Each contractor gets a portal to add workers, which your HR or safety team approves before passes are issued.

Does it work with our turnstiles?

Most turnstiles that accept Wiegand, OSDP or relay commands work. See Access Control for details.

Can we track material without weighbridge integration?

Yes. Guards record quantity and weight on the tablet. Weighbridge readings can be added where available.

Can we see headcount in an emergency?

Yes. The muster list shows everyone inside by area and contractor, and can be opened from any phone with access.

12:00 AM Gates closed, all safe

Close the paper register tonight.Open the gate on a pass tomorrow.

Try Ctrlapptech free for 30 days on one site with up to 2 gates. Guards learn the tablet in under an hour and residents or employees join from a link.

Pass
Trial
Site
1
Gates
Up to 2
Valid
30 days

No card needed for the trial. Your data stays yours if you leave.